QTY & Testing

Every spring support that leaves our facility undergoes a multi-stage quality verification process — from incoming raw material checks through to final load calibration and documentation.

Our QA Protocol

Testing Stages

01

Incoming Raw Material Inspection

All incoming spring steel, structural sections, and fasteners are inspected against mill certificates. Hardness, tensile strength, and dimensional checks are performed before material is released to production.

02

In-Process Quality Checks

Roving inspectors conduct dimensional verification at each production stage — coiling, heat treatment, machining, and fabrication — using calibrated gauges and CMM equipment.

03

Load Calibration & Spring Rate Verification

Each spring assembly is tested on a calibrated load-testing bench. Spring rate, installed load, and cold-load values are verified against design drawings before acceptance.

04

Travel Indicator & Movement Check

Variable spring supports undergo travel range verification. Locking pins, travel indicators, and indicator positions are confirmed per project-specific data sheets.

05

Final Inspection & Certification

A QC engineer performs a complete dimensional, visual, and functional check. Approved units receive a unique serial number and are accompanied by a test certificate and Mill Test Report (MTR).

06

Third-Party & Client Witness Inspection

On-demand third-party inspection by TPIA agencies (Bureau Veritas, Lloyd's, SGS, etc.) is accommodated. Client witness inspections can be arranged at our facility for critical orders.

LOAD TEST CALIBRATED BENCH ✓ ACCEPTED
  • Calibrated load-test bench (0–50 kN)
  • CMM-based dimensional verification
  • Hardness testing (Rockwell & Brinell)
  • Dye-penetrant & MPI weld inspection
  • Full traceability via unique serial numbers
  • Test certificates & MTRs for every order
Standards We Follow

Quality Benchmarks

01
📋
ISO 9001 : 2008

Our quality management system is certified to ISO 9001:2008, governing all processes from design to dispatch.

02
⚖️
MSS SP-58 / SP-69

Spring hanger design and material acceptance follows MSS SP-58 and SP-69 pipe support standards.

03
🔬
NDT Weld Inspection

Structural welds are subject to dye-penetrant testing and magnetic particle inspection per applicable codes.

04
📝
Full Documentation Pack

Each shipment includes GA drawings, inspection records, MTRs, test certificates, and packing lists — all referenced to the purchase order.

05
👁️
TPIA & Client Witness

We accommodate Bureau Veritas, Lloyd's Register, TÜV, and SGS witness inspections on customer request.

06
🔒
Zero-Defect Dispatch Policy

No unit is released to packaging without a QC sign-off. Non-conforming products are segregated and raised as NCRs.

Need a Witnessed Inspection?

Contact our QA team to schedule a third-party or client witness inspection at our facility.